Back to Home

INSPECTION & QUALITY

Inspected Before It Leaves the Factory

Before your unit leaves the factory, we review it against the agreed specifications — documenting condition, systems, and equipment so you know what is being shipped.

Inspected Before It Leaves the Factory

INSPECTION & QUALITY

A pre-shipment review against the agreed specifications.

01

Possible Inspection Areas

Where practical, the following areas may be reviewed before the unit leaves the factory.

  • Dimensions
  • Exterior condition
  • Doors
  • Serving windows
  • Kitchen layout
  • Stainless-steel surfaces
  • Cooking equipment
  • Refrigeration
  • Storage
  • Electrical installation
  • Voltage
  • Sockets
  • Lighting
  • Water tanks
  • Plumbing
  • Sinks
  • Wastewater system
  • Gas installation
  • Ventilation
  • Extraction hood
  • Fire-safety equipment
  • Generator
  • Power systems
  • Tires
  • Chassis
  • Brakes
  • Towing components
  • Branding
  • Graphics
  • Equipment list
  • Accessories
  • Functional testing where possible
  • Packaging
  • Loading preparation
  • Photo and video documentation
02

Inspection Timeline

The inspection process follows a structured sequence, from agreed specifications to shipping authorization.

  • Approved specifications
  • Production monitoring
  • Pre-shipment inspection
  • Issue reporting
  • Corrections where applicable
  • Final documentation
  • Shipping authorization

Our inspection helps identify visible issues and review the agreed specifications before shipment. It does not replace government inspections, engineering approval, road registration, food-service permits, electrical certification, fire approval, or local authority requirements.

YOU ALREADY HAVE THE IDEA.

NOW YOU NEED THE RIGHT FOOD TRUCK.

Let Chozen Foodtrucks help you move from concept to a professionally planned mobile food business.

Request a Quote